• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • Advertise
  • Subscribe

Wire and Cable Tips

  • Basics of Wire and Cable
  • Industry News & Events
  • Blog
  • Markets
    • Automation
    • Construction/Off-Highway
    • Electronics
    • Food/Beverage
    • Medical/Pharmaceutical
    • Military/Aerospace
    • Offshore/Marine
    • Oil/Gas
    • Renewables/Energy Production
    • Robotics
    • Semiconductor
  • Products
    • Data Transmission
    • Networking
    • Power Transmission
  • Suppliers
  • Video

Northwire expands its New Mexico cable manufacturing facility

February 16, 2017 By Mary Gannon Leave a Comment

NM-Facility-300x172Having opened in 2004, Northwire’s wire and cable manufacturing facility in Santa Teresa, N.M. continues to receive increased customer demands for a wide range of standard and custom wire and cable systems and personalized cable solutions.

In response to this, Northwire is expanding upon the capabilities of this facility by transitioning to a continuous 24 hours a day and seven days a week operation structure. The NWI Santa Teresa team is being expanded to accommodate the increase in cable assembly production with an anticipated start date of March 27 for the new 24/7 schedule.

Strategically positioned, NWI’s facility within the Santa Teresa region is ideal for copper sourcing and distribution to the Southwest, Mexico, and Central and South America making this geographic location rich with business opportunities.

The team at the NWI Santa Teresa facility also offers:

  • Research and development for cable products
  • Extreme quality testing
  • Individualized customer care

Furthermore, Northwire’s partnership as a LEMO Group Company offers fully integrated cable and connector solutions for engineers within the aerospace, energy, industrial, and medical cable markets.

Northwire
www.northwire.com

Filed Under: DW sync, Industry News & Events Tagged With: lemo, Northwire

Reader Interactions

Leave a Reply Cancel reply

You must be logged in to post a comment.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Primary Sidebar

EE ENGINEERING TRAINING DAYS

engineering

LEARNING CENTER

Design World Learning Center
“bills

RSS Current EDABoard.com discussions

RSS Current Electro-Tech-Online.com Discussions

  • EasyEda program has a major bug
  • understanding transmission line properties from TDR plot
  • isolating S-params in of PCB board without connectors
  • Some opamp advice please
  • want help with microprocessor
“wire
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.

Footer

Design World Network

  • Design World Online
  • The Robot Report
  • Coupling Tips
  • Motion Control Tips
  • Linear Motion Tips
  • Fastener Engineering
  • Bearing Tips

Wire and Cable Tips

  • Subscribe to our newsletter
  • Advertise with us
  • Contact us
  • About Us

Copyright © 2026 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy